RFQ check at a glance
Status as of Sep 28, 2026 3 RFQs waiting for clarification Oldest waiting 8 days
What Keelson needs on every Tarrow RFQ before engineering review, how the 14 RFQs received since Aug 8 measured up, and the three RFQs that still wait for an answer from Tarrow purchasing. Prepared by the Keelson inside sales desk for Ingrid Solheim, director of purchasing at Tarrow Pump Systems, and the Tarrow buyers. Rosalind Chau, vice president of engineering at Keelson Precision Manufacturing, decided that no RFQ enters engineering review without the drawing revision letter. Benedict Oyelaran, commercial operations manager, returned the three open RFQs to Ingrid with the exact missing fact on each.
The check every RFQ gets
Every Tarrow RFQ is read against the same list when it arrives. The agreed RFQ rule is: drawing revision, quantity, material, tolerance and delivery date before engineering review. For blanket order releases the sheet also asks for annual volume. A quote built from the RFQ is valid for 30 days from issue, so a missing fact found late costs days of that window.
The list below shows the check for RFQ 5125, a pump housing. Five facts are present. The drawing revision letter is not.
Requirements check for RFQ 5125, pump housing
- Drawing revision letter. Missing: the attached drawing shows the part number and no revision letteropen
- Quantity. Present: 120 pieces for the first releasedone
- Material. Present: the casting alloy named on the drawingdone
- Tolerance. Present: the bore and flange callouts are legibledone
- Delivery date. Present: the required date is on the RFQdone
- Annual volume. Present: the blanket order volume is stateddone
An RFQ with all six items ticked moves to commercial fit and then to engineering review. An RFQ with any item open goes back to Tarrow once, with that item named.
How the 14 RFQs sorted
Nine RFQs were complete on the first pass and went straight to commercial fit. Two needed an answer and were released after it arrived. Three are still waiting. Read the bars from left to right: the first is the work that cost Tarrow and Keelson nothing extra, the last is the work that is stuck today.
The oldest of the three has waited 8 days for the missing fact. Before the revision rule, engineering found the same gap only after review had started. Tarrow buyers attach the drawing without the revision letter, so the gap is easy to miss on the buyer side and easy to catch on the first read.
Why five needed clarification
Five of the 14 RFQs were not complete on the first pass. Three lacked the drawing revision letter and two lacked annual volume. The two annual volume RFQs were answered and released. All three RFQs still waiting are missing the drawing revision letter.
The five RFQs took 2 clarification cycles on average. A cycle is one request from Keelson and one answer from Tarrow. The aim of this sheet is one cycle for every RFQ.
Complete on the first pass
The count below is the one Tarrow sees at the top of the sheet. It counts RFQs, not lines, and the three waiting RFQs count as not complete until the fact arrives.
RFQs complete on the first pass, 9 of 14
The three RFQs still waiting
Days waiting are counted to Sep 28. Each RFQ is missing one fact and Benedict Oyelaran sent each request to Ingrid Solheim with a reply date of Oct 6.
| RFQ | Part family | Fact missing | Days waiting | Reply owed by | Needed by | State |
|---|---|---|---|---|---|---|
| RFQ 5125 | Pump housings | Drawing revision letter | 8 | Ingrid Solheim | Oct 6 | Clarification needed |
| RFQ 5127 | Impellers | Drawing revision letter | 5 | Ingrid Solheim | Oct 6 | Clarification needed |
| RFQ 5129 | Shaft assemblies | Drawing revision letter | 2 | Ingrid Solheim | Oct 6 | Clarification needed |
"A request that names the missing revision letter and gives a reply date gets one answer. A general request about the drawing gets two or three rounds."
Benedict Oyelaran, Commercial operations manager, Keelson Precision Manufacturing
How an RFQ moves
An RFQ has one of four states on this sheet: received, clarification needed, commercial fit, engineering review ready. The loop on the right of the diagram is the one to shorten. Every trip around it costs Tarrow a day or more of waiting.
- RFQ received from TarrowRead against the six facts
- One request to Tarrow purchasingNames the exact missing fact
- Tarrow supplies the factReply owed by Oct 6
- Checked againThe loop repeats only if a fact is still missing
- Engineering review readyQuote built on the accepted revision
Sending one clarification request
Each waiting RFQ follows the same five steps. The marks below show RFQ 5125 as of Sep 28.
- Read RFQ 5125 against the six requirements
- Name the one missing fact: the drawing revision letter
- Send one request to Ingrid Solheim with a reply date of Oct 6
- Tarrow replies with the revision letter by Oct 6
- Re-check the RFQ and release it to engineering review
The request that went out for RFQ 5125 reads as follows. The same wording is used for 5127 and 5129 with their own part family and missing fact.
To: Ingrid Solheim, Director of purchasing, Tarrow Pump Systems
From: Keelson inside sales desk
Subject: RFQ 5125, pump housing: drawing revision letter needed
Ingrid,
The drawing attached to RFQ 5125 shows the part number but not the revision letter. Please send the revision letter for the attached housing drawing by Oct 6.
Quantity, material, tolerance, delivery date and annual volume are complete. Engineering review starts as soon as the letter arrives.
Keelson Precision Manufacturing, inside sales desk
Owners and dates
- Receive the drawing revision letters for RFQ 5125, 5127 and 5129. Owner: Ingrid Solheim, Oct 6open
- Re-check each RFQ against the six requirements the day the letter arrives. Owner: Keelson inside sales desk, same dayopen
- Release complete RFQs to engineering review and tell Tarrow the review start date. Owner: Benedict Oyelaran, Oct 7open
- Add the revision letter to the Tarrow RFQ template so buyers see it as a required line. Owner: Benedict Oyelaran, Oct 9open
- Return the three open RFQs to Tarrow purchasing with the exact missing fact. Owner: Benedict Oyelaran, sent as each RFQ was checkeddone
Who is on this sheet
- Ingrid SolheimDirector of purchasing, Tarrow Pump Systems, supplies the missing facts
- Rosalind ChauVice president of engineering, Keelson Precision Manufacturing, decided the revision rule
- Benedict OyelaranCommercial operations manager, Keelson Precision Manufacturing, owns the RFQ queue