Tarrow Pump SystemsDecision room with Keelson
More
Theme
Ask Benedict
Ingrid SolheimDirector of purchasing, Tarrow Pump Systems
Decisions answered 0 of 4Next answer owed Oct 6

Files

What Keelson needs from your team, why, and by when. Upload straight into the request.

4 requests open
  • Drawing revision letters for RFQ 5125, 5127 and 5129Ingrid Solheim. None of the three can enter engineering review without them.Due Oct 6
  • Signed decision on quote Q-9235Ingrid Solheim. Accept, decline or a written question.Due Oct 7
  • Decisions on the bore tolerance, flange flatness and port thread, on revision DIngrid Solheim. A marked-up drawing or a written answer for RFQ 5102, 5111 and 5124.Due Oct 8
  • Signed acceptance or decline of the order 2287 changeIngrid Solheim. Nothing is released before it arrives.Due Oct 9
  • Housing drawings, revision DReceived by email on Sep 24 and logged as the accepted revision for quoting.Received

File requests

Each request shows what it unblocks and its due date. Your team uploads directly, and Benedict checks the file against the RFQ.
Open in File Request